Our Design & Build Approach (Commercial Interiors in KL)

At Goodwinds, design isn’t just how it looks—it’s how it works.

Our design-and-build model gives you one accountable partner from brief to handover, with clearer timelines, tighter cost control, and fewer surprises.

Why Choose Design & Build with Goodwinds?

Single Point of
Accountability

One team for design, costing, approvals, and build. No finger-pointing, just delivery.

Cost &
Timeline Certainty

Early budgeting, BOQ (Bill of Quantities) clarity, and a locked schedule reduce overruns.

Brand-First,
Function-Led

Spaces that look on-brand and perform under daily load—office, retail, and hospitality.

Compliance
& Safety

We coordinate landlord / authority submissions and enforce site HSE standards.

Our Process
(End-to-End)

Discovery & Brief

Business goals, operational needs, brand cues, site conditions.

Feasibility & Budgeting

High-level space plan, initial BOQ ranges, and risk scan.

Concept & 3D Visualisation

Defects support and optional maintenance guidance.

Technical & Approvals

Detailed drawings, M&E (Mechanical & Electrical) landlord submissions.

Procurement & Value Engineering (VE)

Like-for-like alternatives that maintain look, performance, and warranty.

Build & HSE Management

On-site PM, quality checks, method statements, and progress reports.

Commissioning & Handover

Snag list, testing, as-builts, O&M manuals, and staff orientation.

Concept & 3D Visualisation

Mood boards, materials, and photo-realistic renders for clear buy-in.

What’s Included

Space planning

3D renders

Shop drawings

BOQ

HSE compliance

Site supervision

O&M manuals

Warranty

M&E coordination

As-built drawings

QA/QC checklists

Full technical drawings

Compliance, M&E & Landlord Coordination

We align electrical loads, HVAC/ventilation, fire safety, and signage guidelines with building management and relevant authorities. This reduces resubmissions, delays, and penalties.

Risk Management & Change Control

Clear variation process, documented approvals, and schedule impact notes—so you always know cost/time implications before we proceed.

Sustainability by Default

01

Low-VOC finishes

02

LED systems with controls

03

Durable, repairable materials

04

Waste-aware site practices.

Sustainability without compromising brand or performance.

Typical Timelines (Guidelines)

Office (3k–10k sq ft):
Design 4–8 wks • Build 8–14 wks

Retail/Showroom (1.5k–5k sq ft):
Design 3–6 wks • Build 6–10 wks

Hospitality (2k–8k sq ft):
Design 4–8 wks • Build 8–16+ wks

Actuals depend on site, approvals, joinery complexity, and phasing.

Tools & Communication

Weekly site reports, milestone reviews, Gantt schedule, WhatsApp/Slack group with your appointed projecet manager (PM), and a single dashboard for drawings, BOQ, and variations.

Case Snapshots (KL)

Standard Chartered Bank (Office/Branch)
Desa Parkcity, KL • 3100 sqft • May 2022

Pet-friendly premium branch with hotel-style arrival, integrated without compromising security & flow.

Star Group – Sales Gallery
Jalan Yap Kwan Seng, KL • 640 sqft • May 2025

Launch-ready micro-gallery that spotlights hero units with focal lighting and clear visitor flow in a compact footprint.

OKI Shukodo Restaurant
Damansara Kim, PJ • 918 sqft • December 2022

Compact kitchen-to-pass flow tuned for speed, with layered lighting for intimate evening service.

FAQs (Design & Build)

Let’s design and deliver a commercial interior that works hard for your brand.

How is design & build different from design only?

We take responsibility for design, costing, approvals, and construction; streamlining decisions and accountability.

Standard workmanship/material warranties; specific items follow manufacturer terms.

We issue a variation with pricing and schedule impact; you approve before we proceed.

Yes, phasing plans and safety controls minimise disruption.

Yes, contractor insurance and HSE protocols are mandatory on all sites.

FAQs (Design & Build)

How is design & build different from design only?

We take responsibility for design, costing, approvals, and construction; streamlining decisions and accountability.

Standard workmanship/material warranties; specific items follow manufacturer terms.

We issue a variation with pricing and schedule impact; you approve before we proceed.

Yes, phasing plans and safety controls minimise disruption.

Yes, contractor insurance and HSE protocols are mandatory on all sites.